top of page
Feather & Flower Tiles

C&M Floor and Wall tiling Projects

Since 1994, C&M have  given each project we work on the personalized attention it deserves. we've worked together with many clients and managed to achieve great results while staying within budget. As a leading Tile Contractor, we take great pride in our work. Check out our previous projects below and get in touch for more information.

THE MAIN ATRIUM, CORN EXCHANGE MANCHESTER

While working on this project, we was very strict about the materials and footprint of our work. The client was interested in an economically and environmentally sustainable outcome, and C&M did everything to respect these wishes throughout the whole process in order to make sure they were satisfied with the outcome.

6 EAST PARADE, LEEDS

For this particular project, we had to go through various compliance measures to make sure our work followed stringent industry standards. This was completed on time and within budget. It’s a great example of our dedication to deliver a quality product and see it through from start to finish despite complications in order to ensure full client satisfaction.

VINCENT CAFE & COCKTAIL BAR, LIVERPOOL

If you’re looking for a certified Tile Contractor to manage a really complex job, consider this project a testament to C&M's abilities to deliver quality results on time and within budget. we worked closely with our client to understand their needs and preferences, and the success of the outcome speaks for itself.

EVERYMAN CINEMA, CHELMSFORD

Our client for this particular project was interested something completely different from the normal cinema concept. we stayed within those boundaries throughout the whole process completing works to the toilets, main bar area, and feature walls around the complex in order to ensure they were satisfied with the outcome.

JOHN LEWIS CAFE, LEEDS

Works to this magnificent building had to be in keeping with the outstanding design of the exterior, C&M was trusted with supplying and fitted all the floor tiling to this John Lewis Store cafe.

COLETS HEALTH & FITNESS, THAMES DITTON.

Since 1977 this club has been the hub for many of the local community. C&M was involved with the major refurbishments to the ladies locker room, spa facilities, and gents locker rooms. completing all the preparation / supply and fitting for all the tiling works.

ONE SPA SHERATON HOTEL, EDINBURGH.

As part of a £2m investment programme in One Spa. The hotel Refurbishment to Reveal New Thermal Suite, reception area and changing rooms. C&M had all works  carried out overnight and the spa stayed open as usual during the day.

bottom of page